Client
Team
Jacques Ferrier Architectures: architects
TPF: engineering
Ligne Environnement et Bâtiment: HQE
Serial Acoustique: acoustician
Laurence Ravoux: signage



Program
Building surface area: 4,600 m² / capacity: 4,000 seats
Construction budget: €6.5 million
Renovation of the Lunel bullring to accommodate 4,000
seats, construction of a roof to protect the public, and
compliance upgrades. The bullring will now be able to host
a variety of events, including bullfighting, sporting events,
concerts, and shows.
équipe ducks
Missions
Scenographic design (spaces and operations)
Design and technical development of the audiovisual
network
Visibility studies
Project coordination and management
Scenography
Visibility study for audience comfort during both bullfighting and concert events. Consultant to the architect for the design of the stands and visibility studies. Definition of the power supplies required for the equipment and various public areas of the arena. Proposal for the layout and use of the multipurpose hall. Project management of the scenographic equipment, box seats, and infrastructure of the site’s stage network.
Missions
Scenographic design (spaces and operations)
Design and technical development of the audiovisual
network
Visibility studies
Project coordination and management